Directional Drilling Projects by ECI Drilling International
Our team provides strength, commitment and a common goal focused on delivering “Excellence of Service” to our customers.
DIRECTIONAL DRILLING PROJECTS
Piedmont Natural Gas Line 427
Project Location: Rocky Mount, North Carolina
Owner of Project: Piedmont Natural Gas
Project Description:
a. Drilling footage: Five (5) Crossings totaling up to 9,328 Ft
b. Formation: Sands, Silts, Clays and Weathered Rock
c. Product Pipe: 16-inch Steel pipe
EPIC Pipeline Spread # 4 Carrizo Springs
Location of Rig: Carrizo Springs TX. Dimmit County to Maverick County TX
Final Completion Date: 4-15-2019
Owner of Project: EPIC
Project Description:
a. Drilling footage: 2 Drills —2800 ft
b. Formation: Shale/ Sandstone
c. Product Pipe: 24-inch X-70, .500 wall Steel Pipe
HEEC 115KV XLPE Submarine Cable Project
Project Location: Boston, MA.
Final Completion Date: 3-2-2019
Owner of Project: Eversource Energy Service
Project Description:
a. Drilling footage: Two (2) Crossings 4300ft (One on Conley Terminal and one on Deer Island)
b. Formation: Jettable Materials & 15,000 PSI Rock Shore Approach
c. Product Pipe: 24” HDPE
Line D Van Zandt to Opelika TX
Location of Rig: Van Zandt to Opelika TX
Begin Operations: 06-2018
Owner of Project: Atmos Energy
Project Description:
a. Drilling footage: Four (4) Crossings 8,514 ft
b. Formation: Jettable silts,sands and clays
c. Product Pipe: 20 inch steel
BLOCK ISLAND CABLE PROJECT
Project Location: Block Island, Rhode Island
Final Completion Date: 5-6-2016
Project Description:
50 feet beneath the state beach in Rhode Island, crews drilled a 2,250 foot tunnel for the conduit that carries power from the 30 MW wind farm to a National Grid switching station in Narragansett, R.I. The installation of undersea and underground cable and related infrastructure supports the first US offshore wind farm, transferring power from a five-turbine offshore wind farm to Block Island and to the mainland power grid.
KAW Water Treatment Plant – Phase I
Project Location: Lawrence, Kansas
Final Completion Date: 7-8-2014
Owners Engineer Representative: Garney Companies, Inc.
Project Description:
Three (3) drills totaling 4,617 linear feet (2,405 – 1,497 – 715) in a jettable and soft shale formation and install one (1) 36-inch PVC pipe per location.
NSTAR/Comcast Hybrid Cable
Project Location: Martha’s Vineyard, MA.
Final Completion Date: 2-10-2014
Owners Engineer Representative: Caldwell Marine International, Inc.
Project Description:
Two drills totaling 6,000 linear feet (2,800 & 3,200) in a jettable and cobble formation and install one (1) 12-inch HDPE pipe per location.
Dam Neck Shore Landing Project
Project Location: Virginia Beach, Virginia
Final Completion Date: 9-19-2012
Owners Engineer Representative: Sound & Sea Technology, Inc.
Project Description:
One (1) drill totaling 6,040 linear feet in a jettable formation of sands and silts and leave in place one (1) 5-inch O.D. x 3.75-inch I.D. pipe.
SAFETY IS OUR #1 PRIORITY
We are committed to achieving an accident free workplace. Proactive involvement, personal responsibility, personal accountability, and continuous individual improvement are expected of all employees, subcontractors, vendors and clients. Safety is of utmost importance in the planning of all work, and every one of our employees embrace his/her role in successfully implementing our Safety Program.